Answered Split or otherwise divde points

Often we have stories that require more than one developer/designer to work on at a time, so we assign all as owners.  For example, a widget is constructed by the dev and buttons for it will be constructed by a designer.  Let's say this is a 5 point story.

If we assign both of them to the ticket, their point load for a given iteration, each user is added 5 points to their cumulative points.  It would be nice if we could at least split or otherwise divide the points up per user.  In the example above, the buttons would only be a 2 point task, whereas the widget would be 3 points.

Didn't find what you were looking for?

New post
Would you like to add your +1 to this post?
1 out of 1 found this helpful

Comments

1 comment

  • Comment actions Permalink

    Hi Jeff,

     

    Thanks for getting in touch with us! We truly appreciate any and all feedback, and do our best to share every piece we get with the team. I definitely can understand this use case and I'm sure our team has had the same questions.

     

    While this isn't on our immediate roadmap, what I'll do is add your +1 and additional context to an internal Story we have tracking this. Since we'll have this conversation associated with that Story, as we prioritize work in the future we'll be able to reach back out to keep you in the loop. The product team will review all submitted feedback to integrate it (as best we can) into future plans.

     

    If there's anything else we can do to further assist, please do let us know - we're here to help!